Crewe Network Rail

Location

Crewe Network Rail

Category

Installation of pad foundations, concrete slab with thickening and power float finish

Date

July 2023 – January 2024

Completed on schedule and within budget

Access to site hindered by narrow tunnel posing logistical challenges; restricted movement of plant and impeded on flow of traffic in and out of site.

Work carried out

  • Installation of pad foundations, concrete slab with thickening and power float finish
  • Clear site left in rough state
  • External works included installing aco drains to footpaths and concrete apron to the front of the building.