Harris Museum basement – prep for install of water management system and excavation of small liftpit
Removed 700m2 of concrete paving from basement floor in preparation for the new water management system Excavated a trench to the perimeter of the building and constructed a new concrete channel.
Basement level was situated 4m below ground level We efficiently removed over 200 tons of waste using our 3phse electric excavator.